UP tie train         
Track laying tie train tied down for the evening. I just got word that the CEO Jim Yong of the UPRR wants the first part of the Double Tracking from Blair to Kennard done by the end of November. This was told to me by a RR employee. In other words. UP isnt playing games. Secondly. The area between Missouri Valley and California Junction is almost done. There going to start laying down the sub-rock next month. I was also told. The Temp switch @ Blair will be replaced with a brand new concrete tie switch switch + a Movable Frog Point will be Dispatcher controlled once the Double Track is done. There is a 32 car concrete tie train now up on the hill with a UP SD70M # 5030 and an EMD GP60 on the dead track. The GP60 is facing RR east. The power is headed to Mo valley in the morning. If anyone will be out and about tomorrow. The tie train will be adding new track from just north of CR26 (Crossing CR26) tomorrow. More updates coming soon.
Date: 9/29/2011 Location: Blair, NE   Map Show Blair on a rail map Views: 131 Collection Of:   Allan Love Jr
Author:  Allan Love Jr.
UP tie train
Picture Categories: This picture is part of album:  Blair Sub Double Tracking.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2747088