Sunday the UP cut the current main and just connected the new track panel track to the older main to ease the curves for faster moving trains over the hill. |
Date:
9/26/2011 |
Location:
Blair, NE Map  |
Views:
123 |
Collection Of:

Allan Love Jr |
|
Author: Allan Love Jr.
|
 |
Picture Categories: |
This picture is part of album: Blair Sub Double Tracking. |