Blair Sub Double Track work         
Tearing up the ground for the road bed. And for the scarpers to haul the dirt work for the new road bed down by Hightway 91 later on.
Date: 1/9/2011 Location: Blair, NE   Map Show Blair on a rail map Views: 101 Collection Of:   Allan Love Jr
Author:  Allan Love Jr.
Blair Sub Double Track work
Picture Categories: This picture is part of album:  Blair Sub Double Tracking.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2369106